  • Project location – Between Haldia and Jellingham channels of Hooghly Estuary
  • Client – NIOT
  • Project description – Conceptual design, supply and operation of water injection dredger for pilot project at location
  • Technical details and constraints Barge – M.V. Waterman with in‐ house developed dredging setup
  • Logistics and operational details Duration – 6 months
  • Project description – Dumping of boulders in Vishakapatnam harbour for construction of additional berth
  • Project description – Excavating at Hooghly river based on bathymetric/ hydrographic survey to obtain the required profile of the river bed at dry rock mouth and disposal of spoils at permitted dump places (45 +‐ 5 nautical miles).

Services Offered

#

Removal and Delivery of KOPT Virtual Jetties from Eden Channel

    • Technical details and constraints
    • Barge – Self propelled Krishnan Barge (40mt X 19mt) with 100 T Crane and 25T winch Tug – Multi purpose 500 BHP tug
    • Logistics and operational details
    • Constraints – Extreme operational conditions with heavy currents, large amount of silt, and long lying anchors and chains in the river bed
    • Duration – 1 month